 
 
  
   
   
	As pictured on Monday, October 27, the new construction at Belgrade Steel Tank now has the beginning of its roof structure in place. The new Nucor pre-engineered manufacturing facility and office space features triple manufacturing lanes to enhance their production capacity and streamline their capabilities. Employment will gradually increase over time above their current figure of around 50 employees.
The attached video was recorded at the construction site on Friday, October 17. This video can be viewed by swiping or clicking left or right on the main image.
Reader Comments(0)